Project Genesis

A new water architecture for southern Tamaulipas.

Genesis turns a sanitation liability into a productive asset: it recovers urban wastewater, treats it for industrial reuse, and frees the freshwater of the Tamesí–Chairel–Champayán system for human supply.

+$5,000M MXN
Announced investment
+2,000L/s
Reuse target
12years
Maximum horizon
2027
First milestone
§ 01 · The water paradox

A land of water, a vulnerable system.

The context

The metropolitan area sits on a territory of rivers, lagoons and wetlands, yet faces droughts, saline intrusion, network losses and competition between urban and industrial uses. The 2024 crisis showed that geographic abundance does not equal water security.

The bottleneck
1,500
L/s · Tierra Negra
300
L/s · Morelos

Substantial installed capacity, underused because wastewater does not always reach the plants. Building treatment without repairing collectors and pumping stations would not solve the problem.

"
Core idea

Genesis turns a sanitation liability into a productive asset: it recovers urban wastewater, treats it for industrial reuse, and thereby reserves the freshwater of the Tamesí–Chairel–Champayán system for human supply.

— Integral report, July 2026
§ 02 · Circular water economy

Five flows, one circuit.

01

Urban sewerage

Rehabilitation of collectors and pumping stations; interception of discharges

More flow captured, fewer overflows
02

Treatment

Use and expansion of existing WWTPs

Regenerated water with defined quality
03

Industrial reuse

Conveyance and delivery to the Altamira corridor

Replacement of first-use freshwater
04

Drinking water

Branches and expanded potabilization

Greater coverage and urban capacity
05

Revenue

Payment from industrial users

Investment recovery and operational sustainability
§ 03 · Disclosed technical architecture

Ten intervention fronts.
Seven hydro-sanitary · three for drinking water.

Hydro-sanitary fronts
HS/01

Laguna del Carpintero

Rebuild collectors; optimize the Primavera pumping station; 8.5 km, 800 L/s system.

Prevent wastewater from reaching the lagoon and redirect it to treatment.

HS/02

Marginal Pánuco

Transition pumping stations between plants/pumping stations 1, 7, 8 and 9.

Collect overflows from Tampico and Madero and channel them toward La Barra.

HS/03

Morelos Plant

Use the reported 300 L/s capacity WWTP.

Increase effective treatment in the served sector.

HS/04

Strategic pumping stations

Intervene Lucio Blanco, Norte and 3 Norte.

Strengthen the sanitary backbone of Tampico and Madero.

HS/05

La Barra

Conveyance / interconnection toward the coastal system.

Transfer flows to Maeva, Miramápolis and Miramar.

HS/06

Adriana González

Sanitary project in the Playa Miramar area.

Integrate sector discharges into the treatment circuit.

HS/07

Madero Oriente

Sanitary project in eastern Madero.

Complete capture and conveyance toward Tierra Negra.

Drinking water
AP/01

South Branch

Drinking water network extension.

Serve growth and improve continuity and coverage.

AP/02

North Branch

Drinking water network extension.

Reinforce supply in expansion areas.

AP/03

Laguna de la Puerta

Potabilization plant expansion.

Increase capacity for new developments.

§ 04 · Financial logic

Replace recurring cost with reusable infrastructure.

Current recurring cost
~$800 M MXN / year

Estimated annual spend on first-use water rights.

Proposed investment
~$500 M MXN / year

Approximate pace to develop the reuse system across the program.

Theoretical annual volume
63.07 M m³
At constant 2,000 L/s
Each $1/m³ tariff
≈ $63.1
M MXN gross annual revenue
Overall scale
$5–6 bn
MXN preliminary investment
§ 05 · Impact in four dimensions

One circuit, four layers of value.

01

Environmental

Less industrial use of freshwater and reduced wastewater discharges.

Capture, treatment, reuse and conveyance to the industrial corridor.
02

Social

Greater relative availability of first-use water for the population.

Substitution of freshwater currently used in industrial processes.
03

Economic

Certainty of industrial supply and valorization of the urban effluent.

Sale of regenerated water and long-term infrastructure creation.
04

Institutional

Cooperation among public, industrial and social sectors.

AISTAC, State Government, COMAPA, municipalities and federal authorities.
§ 06 · Expected benefits

Population, environment, industry.

For the population

  • Release of first-use water currently allocated to industry.
  • Fewer sewer overflows, odors and visible pollution.
  • Greater potabilization and network capacity.
  • Better resilience against droughts and salinity events.

Urban and coastal environment

  • Sanitation of the Laguna del Carpintero.
  • Reduced loads to the Pánuco river and the Miramar coast.
  • Recovery of ecosystem services and landscape.
  • Lower extraction from the lagoon system, subject to verifiable substitution.

Industry and competitiveness

  • Predictable alternative source for the petrochemical corridor.
  • Long-term supply certainty.
  • Valorization of urban effluent as a productive input.
  • Replicable circular water economy model.
§ 07 · Actors and leadership

A public–industrial alliance.

AISTAC
Promoter of the concept, articulating industrial demand and private financing.
Citizens' Water Council
Voice of civil society in governance, oversight and sustainable water use.
Luis Apperti Llovet
AISTAC Coordinator of Strategic Projects and technical-business spokesperson.
Tamaulipas Government / SRHDS
Co-driver, water planning and drinking water projects.
COMAPA Sur
Infrastructure and operation of sewerage, pumping stations, treatment and networks.
Municipalities
Territorial coordination, urban works and local sanitation.
Conagua / Basin Agency
Federal authority over national waters, discharges and concessions.
Altamira Industry
Potential buyer of treated water and revenue source for the scheme.
§ 08 · Mentioned technologies

Rehabilitate without opening the street.

CIPP · Cured-in-place pipe

Trenchless pipe rehabilitation

A liner is inserted and cured inside the existing pipe, forming a new conduit and reducing the need to open streets along the intervened length.

Inspection robots
Interior diagnosis of the sanitary network.
Artificial intelligence
Prioritization, rehabilitation and operational transition.
Transition pumping stations
Interception between plants 1, 7, 8 and 9.
§ 09 · Time horizon

From 2026 to a program of twelve years.

2026
Public announcement
Fourth State Water Forum, March 19–20.
2027
First phase
Around $500M MXN completed.
+12
Full execution
Long-term program subject to permits and contracts.
30–100
Water horizon
Long-term security declarations.

Close the cycle.
Free the water.

A circular economy model that links urban sanitation, availability for human consumption and industrial competitiveness in southern Tamaulipas.

Project Genesis

Public information available as of July 12, 2026 · Tampico, Tamaulipas.

Note

Document prepared with public information. Figures and statements adhere to the project's integral report and referenced official notes.